Process & FAQs
Our experienced team is here to help. With decades of combined modular home experience, the team at Modern Modular is excited to help you through this journey to ensure the process is as stress free as possible.
Connect with our team today to learn more about our process.
How It Works
Design &
Consultation
- Initial Site Feasibility Study
- Initial project scope review and budget creation
- Preliminary zoning review and design package
Fabrication & Production
- Drawing and Engineering compliance review
- Module fabrication and assembly
- QA/QC internal review
- CSA review and inspection
Logistics & Installation
- Post Foundation site review
- Transport, Crane and Installation scope review and approval
- Project installation
- Occupancy and Warranty
frequently asked.
For a complete list of states that qualify please reach out to our sales team.
1- Reduced project schedule: With the home being built offsite, other tasks can take place simultaneously condensing the schedule and allowing you to enjoy your investment sooner.
2-Remote Site Access: Conventional site construction in remote or challenging locations can be cumbersome, expensive and time consuming. Prefab construction means less trips to site, less site construction, less neighborhood disturbance and a quicker overall process.
3-Quality Control/Quality Assurance: Our homes are built in our Canadian based manufacturing facility. Our product and our facility are both strictly regulated and inspected by a third party engineering review certified through Intertek. For a complete list of states that qualify please reach out to our sales team
Our homes are built on a steel skid foundation, framed using cold formed steel (CFS), insulated with spray foam and exterior zip system, and wrapped with metal cladding. Durable, fire resistant and nearly maintenance free.
We recommend reaching out to your local financial institution to walk you through the process of financing your Modern Modular home.
Our homes are designed to be installed onto a permanent foundation. This is typically a concrete grade beam foundation or screw piles.
Depending on the model chosen, it takes between 6-8 weeks to manufacture and assemble your unit In our facility. Actual lead times vary based on current workload and production slot. Please reach out for more information.
Yes, each of our models have a selection document with a pre approved interior and exterior finish to choose from.
Yes, for an additional cost our team can manage all aspects of the delivery, initial set up and installation of your unit on your property. The details and specifics will be outlined in your estimate.
Our Mod Series floor plans are meticulously designed to optimize space and comply with building requirements. While not customizable you can adjust interior and exterior finishes.